A staged, cash-flow-gated march. Phases are gated by cash flow, not fundraising milestones — each phase must pay for the next.
Paid engineering programmes across EV charging, storage and inverter categories. First products certified and in market through partner manufacturing.
Recurring problems become BAE catalogue products — supplied and licensed to multiple brands, building a recurring royalty base on top of engineering fees.
Every design shipped deepens our understanding of the power devices inside. Phase 3 turns that knowledge into GaN/SiC device and module design — fabless, through ISM-enabled foundry and OSAT capacity.
Integrated design-to-device capability serving India's EV, renewable and industrial base — the strategic supplier India's energy transition will need.
A services firm becomes defensible when every project makes the next one cheaper, faster and harder to replicate — reusable modules, compliance depth, India-conditions engineering, and a design library competitors start against from zero.