The world needs more energy — and wastes too much of it in power conversion. We make power devices smaller and more efficient, building from sourcing today to designing our own tomorrow.
Every charger, inverter, motor drive and grid converter runs on power semiconductors — and they decide how much energy survives the journey. Smaller, more efficient power devices mean less heat, less waste, more usable power. That is the problem worth our life's work — and it starts with India.
An India-born company on one mission: make power smaller, more efficient, and made here. We start where the pain is real today — helping India's hardware makers source the power semiconductors they can't easily get — and we build, step by step, toward designing our own best-in-class power devices.
One story, four chapters — each one funding and informing the next. Click a chapter.
SiC, IGBTs, gate-drivers, MCUs — on 30–40 week lead-times and tight allocation. We find the part, the qualified alternate, the real INR landed cost, and we move fast when a line is down. Real value, real revenue, from day one.
Which SiC / IGBT / gate-driver / MCU is actually available in India — and the qualified drop-in when a part is on allocation.
Real INR landed cost — duty, IGST, freight — and honest lead-times. Grounded BOM decisions, not guesswork.
Line down or a 50-week lead? We locate stock and drop-ins within 24–48h. No find, no fee.
Every part we source teaches us exactly which device India most needs and where today's silicon falls short. That data is the unfair advantage we'll use to design power devices that waste less and do more — turning India from an importer of power semiconductors into a maker of the best ones.
That is what Bharat Advanced Energy is building toward, one honest step at a time.
Makers, investors and partners — tell us who you are and what you need. We read every message.
Prefer email or a call? Reach the founder directly.
Weekly Supply Brief
India power-semiconductor lead-times, allocations and price moves.